Order follow-up
Review the order row
Loading
Operational reporting
See production follow-up, machine status, labor, operational issues and order activity in one connected view — with direct access to the underlying production record.
Staffing changes vs previous shift
Machine issues open now
Quality cases open now
Material risks requiring attention
| Order | Article | Reported good (est.) | Scrap | Setup h | Production h |
|---|---|---|---|---|---|
| PO-100458 | BRK-001 | 1,340 | 28 | 1.2 | 6.4 |
| PO-100457 | HSG-004 | 930 | 12 | 0.8 | 4.1 |
| PO-100462 | PLN-006 | 0 | 0 | 2.4 | 0.0 |
| PO-100455 | CAP-010 | 3,420 | 64 | 0.5 | 8.6 |
Illustrative example. Views depend on recorded production data and permissions.
OPERCORE combines live floor status, order follow-up, staffing and operational risks in one connected view.
Key operational changes since the last period.
See what is running, in setup, blocked or idle.
Keep track of what needs attention now.
Spot material and planning risks early.
Staffing changes vs previous shift
Machine issues open now
Quality cases open now
Material risks requiring attention
| Order | Article | Recorded activity |
|---|---|---|
| PO-100458 | BRK-001 | Material return recorded |
| PO-100457 | HSG-004 | Production recorded |
| PO-100462 | PLN-006 | Setup recorded |
| Order | Article | Reported good (est.) | Scrap | Setup h | Production h |
|---|---|---|---|---|---|
| PO-100458 | BRK-001 | 1,340 | 28 (2.1%) | 1.2 | 6.4 |
| PO-100457 | HSG-004 | 930 | 12 (1.3%) | 0.8 | 4.1 |
| PO-100462 | PLN-006 | 0 | 0 (0.0%) | 2.4 | 0.0 |
| PO-100455 | CAP-010 | 3,420 | 64 (1.9%) | 0.5 | 8.6 |
| PO-100461 | SHA-002 | 1,980 | 30 (1.5%) | 1.1 | 7.8 |
| PO-100499 | PLT-006 | 640 | 35 (5.5%) | 0.5 | 2.0 |
| PO-100448 | HSG-084 | 2,100 | 19 (0.9%) | 1.4 | 5.6 |
Reported-good values reflect recorded production stops and may span multiple operations.
Review setup time, production time, labor versus standard, scrap versus expected, and recorded production activity without losing the link to the underlying production record.
See how operator time is recorded against each order.
Compare order-to-date scrap with the expected scrap target.
Compare actual operator hours with standard setup and labor time.
See the production activity recorded during the selected factory days.
Move directly from the order row to materials, inspections, quantities and recorded events.
From follow-up to evidence
Start with an order in Follow-up, open its production record, and review the recorded quantities, materials, inspections and events behind the work.
Review the order row
Open order context
See recorded quantities
Review operational evidence
Follow the recorded story

Bracket, machined
Sample customer · Example order
| Time | Material | Quantity | Type | Reference |
|---|---|---|---|---|
| Mar 6, 07:12 | AL-1001 | 1,520 pcs | Issue | MAT 78436 |
| Mar 6, 14:21 | AL-1002 | 20 pcs | Return | MAT 78405 |
| Time | Event | Details | User |
|---|---|---|---|
| Mar 6, 14:31 | Material return | 20 pcs AL-1002 | SK |
| Mar 6, 14:12 | Inspection | 10 pcs inspected (3 found) | JK |
| Mar 6, 12:03 | Machine issue closed | Issue closed | SK |
| Mar 6, 10:24 | Machine issue | Tool wear — replaced | SK |
| Mar 6, 08:12 | Production started | Order started | MM |
| Mar 6, 07:12 | Setup completed | Setup time 1.2 h | MM |
| Mar 6, 06:00 | Setup started | Order in setup | MM |
OPERCORE shows live machine state, technical issue context and an OEE-style machine summary for day-to-day operational follow-up.
See current machine state for each machine.
Understand recorded technical issues affecting the machine.
Review technical issues and recorded interruption context alongside production.
See a simple machine-day summary of availability, performance and quality.
OEE-style summary shown for machine-day follow-up.
Ask OPERCORE
Ask OPERCORE can explain a production order's recorded history and quantities, and answer supported machine-status questions using OPERCORE records.
Which machines are blocked?
There is 1 machine currently blocked:
Recorded interruption: 2 hours 18 minutes.
The related production order and recorded events are on the production record.
Show the history of PO-100458
Here are the recorded events for PO-100458:
You can open the full order history for more details.
Open order historyConnect production, machines, quality, and recorded evidence into one operational reporting flow.